Indiana Administrative Code
Title 329 - SOLID WASTE MANAGEMENT DIVISION
Article 10 - SOLID WASTE LAND DISPOSAL FACILITIES
Rule 10 - Transition Requirements of Municipal Solid Waste Landfill Siting, Design, and Closure
Section 10-2 - Pending applications
Current through September 18, 2024
Authority: IC 13-14-8-7; IC 13-15; IC 13-19-3
Affected: IC 13-14; IC 13-20; IC 36-9-30
Sec. 2.
An owner, operator, or permittee of an MSWLF that is issued a permit for a new facility or a major modification on or after April 1, 2004, based upon an application received before that date, shall, within sixty (60) days following issuance of the permit for a new facility or a major modification, submit the following:
(1) Any necessary permit modification application to comply with this article, as amended on April 1, 2004, unless subdivision (2) is applicable.
(2) All information for the agency's approval, which includes the SWP3 and associated information as required in 329 IAC 10-11-2.5(a)(10) through 329 IAC 10-11-2.5(a)(13), 329 IAC 10-15-2(b)(10) and 329 IAC 10-15-2(b)(11), 329 IAC 10-15-2(d)(4)(G) through 329 IAC 10-15-2(d)(4)(L), and 329 IAC 10-15-12 [ 329 IAC 10-11-2.5(a)(10) through 329 IAC 10-11-2.5(a)(13), 329 IAC 10-15-2(b)(10) and 329 IAC 10-15-2(b)(11), 329 IAC 10-15-2(d)(4)(G) through 329 IAC 10-15-2(d)(4)(L), and 329 IAC 10-15-12] . The submission must include all required information.