Rule 3 - Public Water Supply Construction Permits
Section 3-5.7 - Notification of construction
Current through September 18, 2024
Authority: IC 13-14-8; IC 13-14-9; IC 13-15-1-2; IC 13-15-2-1; IC 13-18-3-1; IC 13-18-4-1
Affected: IC 13-11-2; IC 13-13-5-1; IC 13-18-2
Sec. 5.7.
The permittee must notify the commissioner a minimum of ten (10) days, excluding Saturdays, Sundays, and state of Indiana holidays, before exercising a permit issued by the commissioner in accordance with this rule. The notification must include the following information:
(1) The construction permit number assigned by the commissioner.
(2) The location of the construction.
(3) A description of the construction.
(4) Anticipated duration of the construction.
(5) The phone number of the permittee or permittee's representative who will be present during the construction.