Sec. 4.
The commissioner may deny the application for any permit required by this rule unless the applicant submits evidence that the following issuance requirements are met:
(1) The facility is designed to be constructed, modified, or installed, and operated in such a manner that it will not violate any of the sanitary or health regulations or requirements existing at the time of application for the permit.
(2) The facility conforms to the design criteria in the "Recommended Standards for Water Works" established by the Great Lakes-Upper Mississippi River Board of State Public Health and Environmental Managers, the American Water Works Association (AWWA) standards, or is based on such criteria acceptable to the commissioner which the applicant shows will produce drinking water of satisfactory quality and normal operating pressure at the peak operating flowrate in accordance with this article.
(3) The facility will conform to any additional requirements specified by the commissioner to produce consistently satisfactory results.
(4) The plans for wastewater disposal meet the requirements of the commissioner.
(5) All additional substantiating information requested by the commissioner has been submitted.