Indiana Administrative Code
Title 327 - WATER POLLUTION CONTROL DIVISION
Article 8 - PUBLIC WATER SUPPLY
Rule 3.5 - General Construction Permit for Water Mains
Section 3.5-1 - Definitions
Current through September 18, 2024
Authority: IC 13-14-8; IC 13-14-9; IC 13-15-2; IC 13-18-1; IC 13-18-3; IC 13-18-4; IC 13-18-16-8
Affected: IC 13-11-2; IC 13-15-2; IC 13-18
Sec. 1.
In addition to the definitions in 327 IAC 8-3-1, the following definitions apply throughout this rule:
(1) "Alternative technical standard" means alternative technical standards as described in 327 IAC 8-3.2-20.
(2) "Average daily customer demand" means the average daily customer demand as determined in accordance with 327 IAC 8-3.3-2.
(3) "General construction permit ban" means a decision issued in conformance with section 8 of this rule.
(4) "Notice of intent letter" or "NOI" means a written notification indicating a responsible person has elected to comply with the terms of this general construction permit rule instead of applying for an individual construction permit.
(5) "Peaking factor" means the peak daily customer demand factor as determined in accordance with 327 IAC 8-3.3-2.
(6) "Public water system's daily capacity" means the public water system's daily capacity as determined in accordance with 327 IAC 8-3.3-3.
(7) "Responsible person" means a person as described by section 6 of this rule.
(8) "Transmission main" means any pipe that: