Indiana Administrative Code
Title 327 - WATER POLLUTION CONTROL DIVISION
Article 5 - INDUSTRIAL WASTEWATER PRETREATMENT PROGRAMS AND NPDES
Rule 3.5 - Streamlined Mercury Variance Requirements and Application Process
Section 3.5-7 - Renewal of SMV

Universal Citation: 327 IN Admin Code 3.5-7

Current through March 20, 2024

Authority: IC 13-13-5-1; IC 13-13-5-2; IC 13-14-8; IC 13-14-9; IC 13-15-1-2; IC 13-15-2-1; IC 13-18

Affected: IC 13-14-8-9; IC 13-18-4

Sec. 7.

(a) An eligible applicant may apply for a renewal of the SMV:

(1) one hundred eighty (180) days prior to the expiration of its NPDES permit; or

(2) within one hundred eighty (180) days after issuance of a revised NPDES permit that establishes a revised mercury discharge limit based on the water quality criteria.

(b) The department may renew an initial SMV in accordance with IC 13-14-8-9 if the applicant demonstrates that implementation of the PMPP has achieved progress toward the goal of reducing mercury from its discharge except as provided in subsection (d).

(c) A renewal application shall contain the following:

(1) All information required for an initial SMV application under section 4 of this rule, including revisions to the PMPP, if applicable.

(2) A report on implementation of each provision of the PMPP.

(3) An analysis of the mercury concentrations determined through sampling at the facility's locations that have mercury monitoring requirements in the NPDES permit for the two (2) year period prior to the SMV renewal application.

(4) A proposed alternative mercury discharge limit, if appropriate, to be evaluated by the department according to section 8(b) of this rule, based on the most recent two (2) years of representative sampling information from the facility.

(d) A PMPP must be revised if implementation of the original PMPP does not lead to demonstrable progress in minimizing the discharge of mercury. If the applicant can provide information, as part of a revision to a PMPP, that demonstrates there is no known reasonable additional action that will reduce mercury, the PMPP may remain as previously approved.

(e) A renewal SMV shall be issued in a timely manner and in accordance with the requirements for the issuance of an initial SMV under this rule. If an applicant submits an application for a renewal SMV at least one hundred eighty (180) days prior to the expiration of its NPDES permit, the department shall make a final SMV decision, if requested by the applicant, concurrent with the final decision on the NPDES permit.

Disclaimer: These regulations may not be the most recent version. Indiana may have more current or accurate information. We make no warranties or guarantees about the accuracy, completeness, or adequacy of the information contained on this site or the information linked to on the state site. Please check official sources.
This site is protected by reCAPTCHA and the Google Privacy Policy and Terms of Service apply.