Indiana Administrative Code
Title 327 - WATER POLLUTION CONTROL DIVISION
Article 19 - CONFINED FEEDING OPERATIONS
Rule 7 - Application Requirements
Section 7-5 - Manure management plan
Current through September 18, 2024
Authority: IC 13-14-8-7; IC 13-15-2-1; IC 13-18-10-4
Affected: IC 13-11-2; IC 13-14; IC 13-15; IC 13-18; IC 13-30
Sec. 5.
(a) A manure management plan must be developed and submitted to the commissioner that contains the following:
(b) If applicable, the manure management plan must also contain a description of any:
(c) A soil test must be obtained that provides sufficient information about soil fertility to allow for nutrient recommendations for existing or planned crops. Soil tests may not represent more than twenty (20) acres per sample. The frequency of this testing must be:
(d) A manure test must be obtained that provides sufficient information about the manure content to allow for nutrient recommendations for existing or planned crops and to minimize nutrient leaching. The frequency of this testing must be:
(e) Manure samples must be representative of the manure that is land applied. If manure is mixed from separate manure storage facilities prior to land application, a composite sample may be taken. If manure is land applied from separate and distinct storage facilities, a sample must be taken from each unique production system.
(f) A manure management plan must be submitted to the department at least one (1) time every five (5) years and with any approval application and renewal application to maintain a valid approval for the CFO. A copy of the current manure management plan must be maintained in the operating record.