Indiana Administrative Code
Title 327 - WATER POLLUTION CONTROL DIVISION
Article 15 - NPDES GENERAL PERMITS AND SPECIFIC CATEGORY INDIVIDUAL PERMIT REQUIREMENTS
Rule 5 - Storm Water Run-Off Associated with Construction Activity (Repealed)
- Section 5-1 - Purpose (Repealed)
- Section 5-2 - Applicability of general permit rules (Repealed)
- Section 5-3 - General permit rule boundary (Repealed)
- Section 5-4 - Definitions (Repealed)
- Section 5-5 - NOI requirements (Repealed)
- Section 5-6 - Submittal of an NOI and construction plans (Repealed)
- Section 5-6.5 - Requirements for construction plans (Repealed)
- Section 5-7 - General requirements for storm water quality control (Repealed)
- Section 5-7.5 - General requirements for individual building lots within a permitted project (Repealed)
- Section 5-8 - Project termination (Repealed)
- Section 5-9 - Standard conditions (Repealed)
- Section 5-10 - Inspection and enforcement (Repealed)
- Section 5-11 - Notification of completion (Repealed)
- Section 5-12 - Duration of coverage (Repealed)
Current through March 20, 2024
Disclaimer: These regulations may not be the most recent version. Indiana may have more current or accurate information. We make no warranties or guarantees about the accuracy, completeness, or adequacy of the information contained on this site or the information linked to on the state site. Please check official sources.
This site is protected by reCAPTCHA and the Google
Privacy Policy and
Terms of Service apply.