Indiana Administrative Code
Title 312 - NATURAL RESOURCES COMMISSION
Article 25 - COAL MINING AND RECLAMATION OPERATIONS
Rule 1 - Definitions
Section 1-26 - "Coal preparation plant" defined

Universal Citation: 312 IN Admin Code 1-26

Current through March 20, 2024

Authority: IC 14-34-2-1

Affected: IC 14-34

Sec. 26.

(a) "Coal preparation plant" means a facility or collection of facilities that perform coal preparation.

(b) A coal preparation plant includes each of the following:

(1) Loading facilities.

(2) Storage and stockpile facilities.

(3) Sheds.

(4) Shops and other buildings.

(5) Water treatment and water storage facilities.

(6) Settling basins and impoundments.

(7) Coal processing and other waste disposal areas.

(8) Roads, railroads, and other transport facilities.

(9) Other associated support facilities.

(c) Exempted from the meaning of coal preparation plant is an operation that:

(1) loads coal;

(2) does not crush, size, or screen coal; and

(3) is not located at or near the minesite.

Disclaimer: These regulations may not be the most recent version. Indiana may have more current or accurate information. We make no warranties or guarantees about the accuracy, completeness, or adequacy of the information contained on this site or the information linked to on the state site. Please check official sources.
This site is protected by reCAPTCHA and the Google Privacy Policy and Terms of Service apply.