Sec. 4.
The commission shall approve the use by a utility of qualified pollution control property to be constructed if the qualified pollution control property consists of one (1) or more air pollution control devices and, after notice and hearing, the commission finds:
(1) the proposed air pollution control devices meet applicable state or federal requirements;
(2) the proposed air pollution control devices are designed to accommodate the burning of coal from the geological formation known as the Illinois Basin;
(3) the estimated costs of construction and installation of the air pollution control devices are reasonable and should be approved by the commission; and
(4) the proposed air pollution control devices will be installed at one (1) or more coal burning generating facilities that will utilize Indiana coal as their primary fuel once the air pollution control devices are fully operational or, if a facility to be equipped with one (1) or more air pollution control devices will not use Indiana coal as its primary fuel totally or in part after the device or devices are fully operational, the utility will be justified in doing so because of: