Rule 4.1 - Cogeneration and Alternate Energy Production Facilities
Section 4.1-10 - Filing of standard offer

Universal Citation: 170 IN Admin Code 4.1-10
Current through September 18, 2024

Authority: IC 8-1-1; IC 8-1-2; IC 8-1-2.4

Affected: IC 8-1-2; IC 8-1-2.4

Sec. 10.

Within sixty (60) days of the effective date of this rule and on or before February 28, of each subsequent year, each generating electric utility shall file with the commission a standard offer for purchase of energy and capacity at rates derived from the appropriate application of sections 8(a) and 9(c) through 9(d) of this rule. Within sixty (60) days of the effective date of this rule and within sixty (60) days of the effective date of any subsequent wholesale rate schedule, tariff, or contract, each nongenerating utility shall file with the commission a standard offer for the purchase of energy and capacity at rates derived from the appropriate application of sections 8(b) and 9(e) through 9(f) of this rule.

Disclaimer: These regulations may not be the most recent version. Indiana may have more current or accurate information. We make no warranties or guarantees about the accuracy, completeness, or adequacy of the information contained on this site or the information linked to on the state site. Please check official sources.
This site is protected by reCAPTCHA and the Google Privacy Policy and Terms of Service apply.