Section 501.200 - Turbine Meters
Current through Register Vol. 48, No. 38, September 20, 2024
a) A utility furnishing natural gas service with turbine meters shall install new turbine meters or revisions to existing meter sets in accordance with the recommendations contained in AGA Report No. 7, Measurement of Natural Gas by Turbine Meters, XQ0601 (February 2006).
b) A utility shall accuracy test a turbine meter at least every 60 months.
c) A utility furnishing natural gas service with a dual rotor turbine meter that has an external means of verifying meter accuracy may extend the accuracy test requirement to at least every 120 months if the utility can demonstrate that it verifies the accuracy of the meter at least every six months and that the meter's performance meets the manufacturer's guidelines.
d) A utility shall spin test and, if necessary, lubricate its turbine meters at least every 12 months. If a turbine meter is not equipped with external lubrication provisions or external means of verifying the operation of the meter, a utility shall spin test the meter every six months. If the turbine meter's spin time is not equal to or greater than the minimum spin time specified by the manufacturer, the utility shall make corrections to the meter to allow the spin time to equal or exceed the manufacturer's specifications.
e) A utility is not required to conduct a spin test of its dual rotor turbine meter if the utility furnishes natural gas service with a dual rotor turbine that has an external means of verifying rotor health, the utility can demonstrate that it verifies the health of the rotor at least every six months, and the utility can demonstrate the performance of the rotor meets the manufacturer's guidelines.
f) A utility shall maintain the most recent five years of inspection records, as well as the dates of all inspections for the most recent 10 years, except accuracy tests. A utility shall maintain documents for each turbine meter's most recent accuracy test, the prior accuracy test, and the dates of any other accuracy test that occurred during the prior 10 years.