Illinois Administrative Code
Title 83 - PUBLIC UTILITIES
Part 467 - ELECTRIC INTERCONNECTION OF LARGE DISTRIBUTED ENERGY RESOURCES FACILITIES
Appendix A - Certificate of Completion

Universal Citation: 83 IL Admin Code ยง A
Current through Register Vol. 48, No. 38, September 20, 2024

Certificate of Completion

(To be completed and returned to the EDC when installation is complete

and final electric inspector approval has been obtained[1])

Interconnection Customer Information

Name: ____________________________________________________

Mailing Address: ____________________________________________

City: ____________________ State: _________ Zip Code: __________

Telephone (Primary): ________________ (Alternate): _______________

Facsimile Number: _______________ E-Mail Address: ______________

InstallerCheck if owner-installed

Name: ____________________________________________________

Mailing Address: ____________________________________________

City: __________________ State: ___________ Zip Code: __________

Telephone (Primary): ________________ (Alternate): _______________

Facsimile Number: ________________ E-Mail Address: _____________

Final Electric Inspection and Interconnection Customer Signature

The distributed generation facility is complete and has been approved by the local electric inspector having jurisdiction. A signed copy of the electric inspector's form indicating final approval is attached. The interconnection customer acknowledges that it shall not operate the distributed generation facility until receipt of the final acceptance and approval by the EDC as provided below.

Signed: _________________________ Date: _______________________

(Signature of interconnection customer)

Printed Name: _________________________

Check if copy of signed electric inspection form is attached

Check if copy of as-built documents is attached

................................................................................................................................

Acceptance and Final Approval for Interconnection (for EDC use only)

The interconnection agreement is approved and the distributed generation facility is approved for interconnected operation upon the signing and return of this Certificate of Completion by EDC:

Electric Distribution Company waives Witness Test?? (Initial) YesNo

If not waived, date of successful Witness

Test:____________________________ Passed: (Initial) ______

EDC Signature: __________________________________ Date: ________

Printed Name: ___________________________________ Title: __________

[1] Prior to interconnected operation, the interconnection customer is required to complete this form and return it to the EDC. Use contact information provided on the EDC's web page for generator interconnection to obtain mailing address/fax number/e-mail address.

Disclaimer: These regulations may not be the most recent version. Illinois may have more current or accurate information. We make no warranties or guarantees about the accuracy, completeness, or adequacy of the information contained on this site or the information linked to on the state site. Please check official sources.