Section 410.160 - Initial Tests

Current through Register Vol. 48, No. 38, September 20, 2024

Initial tests are tests made before installation, regardless of whether the meter and associated devices have previously been in service. Each meter and associated devices (unless included in the sample testing plan in Section 410.180) shall be inspected and tested in the meter shop of the entity or other location that meets the requirements of this Part before being placed in service, and the accuracy of the meter shall be within the tolerances permitted by this Part. If a meter is removed from a customer's premises, except for field testing, it shall be tested and inspected as described above before it is placed in service again. If creep or inaccuracy is discovered in a meter removed from service, the entity shall correct the metering data as detailed in Section 410.200.

Disclaimer: These regulations may not be the most recent version. Illinois may have more current or accurate information. We make no warranties or guarantees about the accuracy, completeness, or adequacy of the information contained on this site or the information linked to on the state site. Please check official sources.
This site is protected by reCAPTCHA and the Google Privacy Policy and Terms of Service apply.