Illinois Administrative Code
Title 62 - MINING
Part 245 - HYDRAULIC FRACTURING REGULATORY ACT
Subpart G - CHEMICAL DISCLOSURE; TRADE SECRETS
Section 245.700 - Chemical Disclosure by Permittee
Current through Register Vol. 48, No. 12, March 22, 2024
a) If the chemical disclosure information required by Section 245.210(a)(8) is not submitted at the time of permit application, then the permittee shall submit this information to the Department in electronic format no less than 21 calendar days before performing the high volume horizontal hydraulic fracturing operations (Section 1-77(a) of the Act).
b) Nothing in this Section shall prohibit the permittee from adjusting or altering the contents of the fluid during the treatment process to respond to unexpected conditions, as long as the permittee notifies the Department by electronic mail within 24 hours of the departure from the initial treatment design and includes a brief explanation detailing the reason for the departure (Section 1-77(a) of the Act).
c) No less than 21 calendar days before performing the first stimulation treatment of HVHHF operations, the permittee shall maintain and disclose to the Department separate and up-to-date master lists of (Section 1-77(c)(2) of the Act):
d) If a permittee uses the services of another person to perform high volume horizontal hydraulic fracturing operations, that person shall comply with Section245.710 (Section 1-77(b) of the Act).