Illinois Administrative Code
Title 62 - MINING
Part 240 - THE ILLINOIS OIL AND GAS ACT
Subpart F - WELL CONSTRUCTION, OPERATING, AND REPORTING REQUIREMENTS FOR PRODUCTION WELLS
Section 240.620 - Remedial Cementing of Leaking Wells

Current through Register Vol. 48, No. 12, March 22, 2024

If the Department determines through field observation that any well is leaking well bore fluid into the freshwater zone or onto the surface, remedial cementing shall be required. The remedial cementing shall be accomplished by:

a) perforating and squeezing cement from fifty (50) feet below the base of the fresh water to the surface, or

b) by extending small diameter tubing behind the production casing to a depth of at least fifty (50) feet below the base of the fresh water and circulating cement to the surface.

Disclaimer: These regulations may not be the most recent version. Illinois may have more current or accurate information. We make no warranties or guarantees about the accuracy, completeness, or adequacy of the information contained on this site or the information linked to on the state site. Please check official sources.
This site is protected by reCAPTCHA and the Google Privacy Policy and Terms of Service apply.