Illinois Administrative Code
Title 62 - MINING
Part 1817 - PERMANENT PROGRAM PERFORMANCE STANDARDS - UNDERGROUND MINING OPERATIONS
Section 1817.122 - Subsidence Control: Public Notice

Current through Register Vol. 48, No. 12, March 22, 2024

At least six (6) months prior to mining, or within that period if approved by the Department, the underground mine operator shall mail a notification to all owners and occupants of surface property and structures above the underground workings. The notification shall include, at a minimum, identification of specific areas in which mining will take place, dates that specific areas will be undermined, the type of mining to be employed, a description of measures that will be taken to prevent subsidence and/or to mitigate subsidence damages which may occur, and the location or locations where the operator's subsidence control plan may be examined. The operator shall maintain copies of all of the public notices mailed pursuant to this Section and shall make such copies available for inspection by authorized agents of the Department.

Disclaimer: These regulations may not be the most recent version. Illinois may have more current or accurate information. We make no warranties or guarantees about the accuracy, completeness, or adequacy of the information contained on this site or the information linked to on the state site. Please check official sources.
This site is protected by reCAPTCHA and the Google Privacy Policy and Terms of Service apply.