Illinois Administrative Code
Title 62 - MINING
Part 1784 - UNDERGROUND MINING PERMIT APPLICATIONS - MINIMUM REQUIREMENTS FOR RECLAMATION AND OPERATION PLAN
Section 1784.24 - Transportation Facilities
Current through Register Vol. 48, No. 12, March 22, 2024
a) Each application shall contain a detailed description of each road, conveyor, and rail system to be constructed, used, or maintained within the proposed permit area. The description shall include a map, appropriate cross-sections, and the following:
b) Primary road certification. The plans and drawings for each primary road shall be prepared by, or under the direction of, and certified by a qualified registered professional engineer as meeting the requirements of 62 Ill. Adm. Code 1817.150 and 1817.151 in accordance with prudent engineering practices. The professional engineer shall be experienced in the design and construction of roads, as evidenced by the placement of a registered professional engineer's seal on the certification.