Illinois Administrative Code
Title 62 - MINING
Part 1780 - SURFACE MINING PERMIT APPLICATIONS - MINIMUM REQUIREMENTS FOR RECLAMATION AND OPERATION PLAN
Section 1780.25 - Reclamation Plan: Siltation Structures, Impoundments, Banks, Dams, and Embankments
Current through Register Vol. 48, No. 12, March 22, 2024
a) Each application shall include a general plan and a detailed design plan for each proposed siltation structure, water impoundment, and coal processing waste bank, dam, or embankment within the proposed permit area.
b) Siltation structures. Siltation structures shall be designed in compliance with the requirements of 62 Ill. Adm. Code 1816.46. Any sedimentation pond or earthen structure which will remain on the proposed permit area as a permanent water impoundment shall also be designed to comply with the requirements of 62 Ill. Adm. Code 1816.49. Each plan shall, at minimum, comply with the requirements of MSHA, 30 CFR 77.216-1 and 77.216-2.
c) Permanent and temporary impoundments. Permanent and temporary impoundments shall be designed to comply with the requirements of 62 Ill. Adm. Code 1816.49. Each plan shall comply with the requirements of MSHA, 30 CFR 77.216-1 and 77.216-2.
d) Coal processing waste banks. Coal processing waste banks shall be designed to comply with the requirements of 62 Ill. Adm. Code 1816.81 through 1816.84.
e) Coal processing waste dams and embankments. Coal processing waste dams and embankments shall be designed to comply with the requirements of 62 Ill. Adm. Code 1816.81 through 1816.84. Each plan shall comply with the requirements of MSHA, 30 CFR 77.216-1 and 77.216-2, and shall contain the results of a geotechnical investigation of the proposed dam or embankment foundation area, to determine the structural competence of the foundation which will support the proposed dam or embankment structure and the impounded material. The geotechnical investigation shall be planned and supervised by an engineer or engineering geologist, according to the following:
f) If the structure meets the Class B or C criteria for dams in TR-60 or meets the size or other criteria of 30 CFR 77.216(a), each plan under subsections (b), (c), and (e) shall include a stability analysis of each structure. The stability analysis shall include, but not be limited to, strength parameters, pore pressure, and long-term seepage conditions. The plan shall also contain a description of each engineering design assumption and calculation with a discussion of each alternative considered in selecting the specific design parameters and construction methods.
g) Submission of MSHA certification documents for a detailed design plan under this Section shall satisfy the requirements of this Section, insofar as the MSHA informational and design standard requirements are duplicative of the requirements of this Section.