a) The following must be constructed according to a Construction Quality Assurance (CQA) program:
1) The construction of a new CCR surface
impoundment, or the lateral expansion of an existing CCR surface
impoundment;
2) The retrofit of an
existing CCR surface impoundment;
3) Installation of a groundwater collection
system and discharge system;
4)
Installation of the groundwater monitoring system; and
5) Installation of the final cover
system.
b) The CQA program must meet the following requirements:
1) The owner or operator of the CCR surface
impoundment must designate a CQA officer who is a qualified professional
engineer.
2) At the end of each
week of construction, until construction is complete, a summary report must be
prepared either by the CQA officer or under the supervision of the CQA officer.
The report must include descriptions of the weather, locations where
construction occurred during the previous week, materials used, results of
testing, inspection reports, and procedures used to perform the inspections.
The CQA officer must review and approve the report. The owner or operator of
the CCR surface impoundment must place the weekly reports in the facility's
operating record (see Section 845.800(d)(3)).
3) The CQA officer must certify the
following, when applicable:
A) The bedding
material contains no undesirable objects;
B) The final closure plan or corrective
action plan approved by the construction permit has been followed;
C) The anchor trench and backfill are
constructed to prevent damage to a geosynthetic membrane;
D) All tears, rips, punctures, and other
damage are repaired;
E) All
geosynthetic membrane seams are properly constructed and tested in accordance
with the manufacturer's specifications;
F) Any groundwater collection system is
constructed to intersect the water table;
G) Any groundwater collection system is
properly constructed to slope toward extraction points, and the extraction
equipment is properly designed and installed;
H) Appropriate operation and maintenance
plans for the groundwater collection system and extraction and discharge
equipment are provided;
I) Proper
filter material consisting of uniform granular fill, to avoid clogging, is used
in construction;
J) The filter
material, as placed, possesses structural strength adequate to support the
maximum loads imposed by the overlying materials and equipment used at the
facility;
K) CCR stabilization;
and
L) Site restoration, if
any.
4) The CQA officer
must supervise and be responsible for all inspections, testing and other
activities required to be implemented as part of the CQA program under this
Section.
5) The CQA officer must be
present to provide supervision and assume responsibility for performing all
inspections of the following activities, when applicable:
A) Compaction of the subgrade and foundation
to design parameters;
B)
Application of final cover, including installation of the geomembrane;
and
C) Installation of the
groundwater collection system and discharge system.
6) If the CQA officer is unable to be present
as required by subsection (b)(5), the CQA officer must provide the following in
writing:
A) The reasons for his or her
absence;
B) A designation of a
person who must exercise professional judgment in carrying out the duties of
the CQA officer-in-absentia; and
C)
A signed statement that the CQA officer assumes full responsibility for all
inspections performed and reports prepared by the designated CQA
officer-in-absentia during the absence of the CQA officer.
7) The CQA program must ensure, at a minimum,
that construction materials and operations meet design
specifications.
Disclaimer: These regulations may not be the most recent version. Illinois may have more current or accurate information. We make no warranties or guarantees about the accuracy, completeness, or adequacy of the information contained on this site or the information linked to on the state site. Please check official sources.