Illinois Administrative Code
Title 35 - ENVIRONMENTAL PROTECTION
Part 813 - PROCEDURAL REQUIREMENTS FOR PERMITTED LANDFILLS
Subpart D - ADDITIONAL PROCEDURES FOR INITIATION AND TERMINATION OF TEMPORARY AND PERMANENT CLOSURE AND POSTCLOSURE CARE
Section 813.401 - Agency Notification Requirements
Current through Register Vol. 48, No. 38, September 20, 2024
a) The operator shall send to the Agency a notice of closure within 30 days after the date the final volume of waste is received.
b) The operator shall notify the Agency within 30 days after any temporary suspension of waste acceptance. The operator must comply with the requirements included in a permitted closure plan in accordance with 35 Ill. Adm. Code 812.114(d) that are applicable during any such period.
c) Until closure has been completed, the operator shall maintain a copy of the closure plan at the site or at a definite location, specified in the permit, so as to be available during inspection of the site.
BOARD NOTE: 35 Ill. Adm. Code 807.Subpart E includes requirements for closure and temporary suspension and for closure and temporary suspension plans.