The application shall contain information to show that the design of the liner system meets the minimum requirements of 35 Ill. Adm. Code 811.306, including the following information:
a) For Compacted Clay Liners:
1) Cross sections and plan views of the liner
system;
2) Results of any field or
laboratory tests demonstrating that the liner material complies with 35 Ill.
Adm. Code
811.306(d);
3) A description of the test liner,
including:
A) Diagrams and any supporting
documentation showing that the test liner will be constructed and evaluated in
accordance with 35 Ill. Adm. Code
811.507(a);
or
B) A detailed description of the
test liner constructed in accordance with 35 Ill. Adm. Code
811.507(a),
if constructed prior to permit application;
4) A description of construction methods and
equipment to be utilized; and
5) A
construction quality assurance plan pursuant to 35 Ill. Adm. Code 811.Subpart
E.
b) For geomembranes:
1) A description of the physical properties
of the geomembrane;
2)
Documentation showing that the design of the geomembrane meets the minimum
requirements of 35 Ill. Adm. Code
811.306(e);
3) A description of the methods to seam the
geomembrane in the field in compliance with 35 Ill. Adm. Code
811.306(e)(5);
4) A plan showing the proposed layout of the
individual panels and the locations of all openings through the
geomembrane;
5) A cross section and
description of how openings in the membrane will be constructed to minimize
leaks; and
6) A construction
quality assurance program pursuant to 35 Ill. Adm. Code 811.Subpart E for
proper construction, seaming and inspection of the geomembrane.
c) For Slurry Trenches and Cutoff Walls:
1) A description of the slurry trench
or cutoff wall, including documentation of cross sections, material
specifications and methods of construction to demonstrate compliance with 35
Ill. Adm. Code
811.306(f);
2) Location and descriptions of the
boreholes, including the results of any testing; and
3) A construction quality assurance plan,
pursuant to 35 Ill. Adm. Code 811.Subpart E.
d) For Alternative Liner Technology:
A complete description of the technology, including documentation demonstrating that the technology will perform as required by 35 Ill. Adm. Code 811.306(f).
Disclaimer: These regulations may not be the most recent version. Illinois may have more current or accurate information. We make no warranties or guarantees about the accuracy, completeness, or adequacy of the information contained on this site or the information linked to on the state site. Please check official sources.