The permit application shall contain a plan for controlling surface water which demonstrates compliance with 35 Ill. Adm. Code 811.103, and which shall include at least the following:

a) A copy of the approved National Pollutant Discharge Elimination System (NPDES) permit issued pursuant to 35 Ill. Adm. Code 309 or, if a permit is pending, a copy of the NPDES permit application to discharge runoff from all disturbed areas on the facility;

b) A map showing the location of all structures affected by the surface water runoff from disturbed areas on the facility;

c) Detailed designs of all structures to be constructed during development of the facility and during the first five year operating period; and

d) Estimated construction dates of all structures to be constructed beyond the first five year operating period.

Disclaimer: These regulations may not be the most recent version. Illinois may have more current or accurate information. We make no warranties or guarantees about the accuracy, completeness, or adequacy of the information contained on this site or the information linked to on the state site. Please check official sources.