Illinois Administrative Code
Title 35 - ENVIRONMENTAL PROTECTION
Part 811 - STANDARDS FOR NEW SOLID WASTE LANDFILLS
Subpart E - CONSTRUCTION QUALITY ASSURANCE PROGRAMS
Section 811.506 - Foundations and Subbases

Current through Register Vol. 48, No. 38, September 20, 2024

a) The CQA officer shall identify and ensure the site investigation is carried out in accordance with the plans, identify unexpected conditions and record all modifications to the plans and construction procedures on the as-built drawings.

b) The CQA officer shall observe soil and rock surfaces for joints, fractures and depressions, document the filling of all joints and fractures and document the removal and filling of local sand deposits on the as-built drawings.

c) The CQA officer shall ensure that there are no moisture seeps and that all soft, organic or other undesirable materials are removed.

Disclaimer: These regulations may not be the most recent version. Illinois may have more current or accurate information. We make no warranties or guarantees about the accuracy, completeness, or adequacy of the information contained on this site or the information linked to on the state site. Please check official sources.
This site is protected by reCAPTCHA and the Google Privacy Policy and Terms of Service apply.