Illinois Administrative Code
Title 35 - ENVIRONMENTAL PROTECTION
Part 811 - STANDARDS FOR NEW SOLID WASTE LANDFILLS
Subpart B - INERT WASTE LANDFILLS
Section 811.205 - Final Slope and Stabilization
Universal Citation: 35 IL Admin Code ยง 811.205
Current through Register Vol. 48, No. 38, September 20, 2024
a) The waste disposal unit shall be designed and constructed to achieve a minimum static slope safety factor of 1.5 and a minimum seismic safety factor of 1.3.
b) Standards for Vegetation
1) Vegetation shall be promoted on all
reconstructed surfaces to minimize wind and water erosion;
2) Vegetation shall be compatible with (i.e.
grow and survive under) the local climatic conditions;
3) Vegetation shall require little
maintenance;
4) Vegetation shall
consist of a diverse mix of native and introduced species consistent with the
postclosure land use; and
5)
Temporary erosion control measures, including, but not limited to, the
application, alone or in combination, of mulch, straw, netting, or chemical
soil stabilizers, shall be undertaken while vegetation is being
established.
c) The landfill site shall be monitored for settling for a minimum period of 15 years after closure as specified in Section 811.203 in order to meet the requirements of this Section.
Disclaimer: These regulations may not be the most recent version. Illinois may have more current or accurate information. We make no warranties or guarantees about the accuracy, completeness, or adequacy of the information contained on this site or the information linked to on the state site. Please check official sources.
This site is protected by reCAPTCHA and the Google
Privacy Policy and
Terms of Service apply.