b) The
Stage 3 site investigation plan must include, but is not limited to, the
following:
1) An executive summary of Stage 2
site investigation activities and actions proposed in the Stage 3 site
investigation plan to identify the extent of soil and groundwater contamination
beyond the site's property boundaries that exceeds the most stringent Tier 1
remediation objectives of 35 Ill. Adm. Code 742 for the applicable indicator
contaminants;
2) The results of the
Stage 2 site investigation, including but not limited to the following:
A) One or more site maps meeting the
requirements of Section
734.440
that show the locations of all borings and groundwater monitoring wells
completed as part of the Stage 2 site investigation;
B) One or more site maps meeting the
requirements of Section
734.440
that show the locations of all groundwater monitoring wells completed to date,
and the groundwater flow direction;
C) One or more site maps meeting the
requirements of Section
734.440
that show the extent of soil and groundwater contamination at the site that
exceeds the most stringent Tier 1 remediation objectives of 35 Ill. Adm. Code
742 for the applicable indicator contaminants;
D) One or more cross-sections of the site
that show the geology of the site and the horizontal and vertical extent of
soil and groundwater contamination at the site that exceeds the most stringent
Tier 1 remediation objectives of 35 Ill. Adm. Code 742 for the applicable
indicator contaminants;
E)
Analytical results, chain of custody forms, and laboratory certifications for
all samples analyzed for the applicable indicator contaminants as part of the
Stage 2 site investigation;
F) One
or more tables comparing the analytical results of the samples collected to
date to the most stringent Tier 1 remediation objectives of 35 Ill. Adm. Code
742 for the applicable indicator contaminants; and
G) For soil borings and groundwater
monitoring wells installed as part of the Stage 2 site investigation, soil
boring logs and monitoring well construction diagrams meeting the requirements
of Sections
734.425
and
734.430
of this Part; and
3) A
Stage 3 sampling plan that includes, but is not limited to, the following:
A) A narrative justifying the activities
proposed as part of the Stage 3 site investigation;
B) A map depicting the location of soil
borings and groundwater monitoring wells proposed to identify the extent of
soil and groundwater contamination beyond the site's property boundaries that
exceeds the most stringent Tier 1 remediation objectives of 35 Ill. Adm. Code
742 for the applicable indicator contaminants; and
C) The depth and construction details of the
proposed soil borings and groundwater monitoring wells.