Illinois Administrative Code
Title 35 - ENVIRONMENTAL PROTECTION
Part 704 - UIC PERMIT PROGRAM
Subpart I - REQUIREMENTS FOR CLASS V INJECTION WELLS
Section 704.284 - Permit Requirements
Current through Register Vol. 48, No. 38, September 20, 2024
No permit is required for a Class V injection well, unless the owner or operator falls within an exception described in subsection (b).
a) General Authorization by Rule. With certain exceptions listed in subsection (b), an owner's or operator's Class V injection activity is "authorized by rule", meaning that the owner and operator has to comply with all the requirements of this Subpart I and the rest of this Part and 35 Ill. Adm. Code 702 and 730, but the owner or operator does not need to get an individual permit. Well authorization expires once the owner or operator has properly closed its well, as described in Section 704.282(b).
b) Circumstances in Which Permits or Other Actions Are Required. If an owner or operator fits into one of the categories listed below, its Class V injection well is no longer authorized by rule. This means that the owner or operator has to either get a permit or close its injection well. The owner or operator can find out whether its well falls into one of these categories by contacting the Agency. Subparts D and H tell an owner or operator how to apply for a permit and describe other aspects of the permitting process. Subpart C of 35 Ill. Adm. Code 702 and Subpart E outline some of the requirements that apply to the owner or operator if it gets a permit. An owner or operator must either obtain a permit or close its injection well if any of the following is true:
BOARD NOTE: A new motor vehicle waste disposal well or a new cesspool is one for which construction had not commenced prior to April 5, 2000. See 40 CFR 144.84(a)(2).
BOARD NOTE: Derived from 40 CFR 144.84 (2017).