Illinois Administrative Code
Title 35 - ENVIRONMENTAL PROTECTION
Part 704 - UIC PERMIT PROGRAM
Subpart E - PERMIT CONDITIONS
Section 704.183 - Construction Requirements

Current through Register Vol. 48, No. 38, September 20, 2024

Existing wells must achieve compliance with construction requirements as set forth in 35 Ill. Adm. Code 730 according to a compliance schedule established as a permit condition. The owner or operator of a proposed new injection well must submit plans for testing, drilling, and construction as part of the permit application. Except as authorized by an area permit, no construction may commence until a permit has been issued containing construction requirements (see Section 704.121 ). New wells must be in compliance with these requirements prior to commencing injection operations. Changes in construction plans during construction may be approved by the Agency as minor modifications. (See 35 Ill. Adm. Code 702.187.) No such changes may be physically incorporated into construction of the well prior to approval of the modification by the Agency.

BOARD NOTE: Derived from 40 CFR 144.52(a)(1) (2005).

Disclaimer: These regulations may not be the most recent version. Illinois may have more current or accurate information. We make no warranties or guarantees about the accuracy, completeness, or adequacy of the information contained on this site or the information linked to on the state site. Please check official sources.
This site is protected by reCAPTCHA and the Google Privacy Policy and Terms of Service apply.