Illinois Administrative Code
Title 35 - ENVIRONMENTAL PROTECTION
Part 604 - DESIGN, OPERATION, AND MAINTENANCE CRITERIA
Subpart G - DISINFECTION
Section 604.715 - Contact Time
Universal Citation: 35 IL Admin Code ยง 604.715
Current through Register Vol. 48, No. 38, September 20, 2024
a) Unless otherwise approved by the Agency under Section 604.145(b), a minimum chlorine contact time of 60 minutes must be provided at all plants treating surface water, groundwater under the direct influence of surface water, groundwater with basins open to the atmosphere, and groundwater obtained from unconfined, fractured bedrock. The equivalent baffling factor must be greater than or equal to 0.3 to prevent short-circuiting. The 60-minute contact time must be calculated based on the following formula:
b) For the purposes of this Section, contact time is measured as follows:
1) When the
treatment process includes filtration, contact time is measured as the time
following filtration of the water until the water reaches the first
user.
2) When the treatment process
does not include filtration, contact time is measured as the time following
chlorination of water until the water reaches the first user.
Disclaimer: These regulations may not be the most recent version. Illinois may have more current or accurate information. We make no warranties or guarantees about the accuracy, completeness, or adequacy of the information contained on this site or the information linked to on the state site. Please check official sources.
This site is protected by reCAPTCHA and the Google
Privacy Policy and
Terms of Service apply.