Illinois Administrative Code
Title 35 - ENVIRONMENTAL PROTECTION
Part 602 - PERMITS
Subpart C - OPERATING PERMITS
Section 602.310 - Projects Requiring Disinfection
Current through Register Vol. 48, No. 38, September 20, 2024
a) Wells, water storage tanks, water treatment plants, and water mains must be disinfected in accordance with AWWA C651, C652, C653, or C654, incorporated by reference in 35 Ill. Adm. Code 601.115.
b) Disinfection of a filter with granular activated carbon (GAC) must be completed before adding the GAC. Disinfection of an ion exchange unit must be completed before adding a resin with a low chlorine tolerance. Disinfection of a membrane unit must be completed before adding membrane material with a low chlorine tolerance. Care should be taken when handling the GAC, resin, or membrane to keep the material as clean as possible.
c) Except as provided in Section 602.315, the permit applicant must verify disinfection before seeking an operating permit-by-rule under Section 602.235 or the issuance of an operating permit by the Agency for completed construction projects. Disinfection is verified when two consecutive water sample sets collected from the completed project at least 24 hours apart show the absence of coliform bacteria and the presence of a chlorine residual as required by 35 Ill. Adm. Code 604.725. A sample set consists of the following:
d) Analyses conducted under this Section must be performed by a certified laboratory.