Illinois Administrative Code
Title 35 - ENVIRONMENTAL PROTECTION
Part 602 - PERMITS
Subpart A - GENERAL PERMIT PROVISIONS
Section 602.105 - Standards for Issuance
Universal Citation: 35 IL Admin Code ยง 602.105
Current through Register Vol. 48, No. 38, September 20, 2024
a) Construction Permits and Operating Permits
1)
The Agency must not issue any construction or operating permit required by this
Part unless the applicant submits adequate proof that the community water
supply will be constructed, modified, or operated so as not to cause a
violation of the Act or Board rules.
2) Except as provided in subsection (a)(3),
the Agency must not issue any construction or operating permit required by this
Part unless the applicant submits adequate proof that the community water
supply facility conforms to the following design criteria. When the design
criteria in the documents listed in this subsection (a)(2) conflict, the
applicant must comply with the design criteria listed in subsection (a)(2)(A).
A) Criteria promulgated by the Board under 35
Ill. Adm. Code 604;
B) Recommended
Standards for Water Works, incorporated by reference at 35 Ill. Adm. Code
601.115; and
C) AWWA, ASTM, ANSI, or NSF standards
incorporated by reference at 35 Ill. Adm. Code 601.115.
3) When the documents listed in subsection
(a)(2) do not provide design criteria for the proposed community water supply
facility, the Agency must not issue the construction or operating permit unless
the applicant submits adequate proof that the community water supply facility
conforms to other design criteria that will produce consistently satisfactory
results. When necessary for adequate proof, the Agency may require a pilot
study.
4) The Agency must not issue
any construction permit required by this Part unless the applicant submits
proof that all plan and specification documents required by this Section and
Subpart B have been prepared by a person licensed under the Illinois
Architecture Practice Act of 1989 [225 ILCS 305
], the Professional Engineering Practice Act of 1989 [225 ILCS
325 ], the Structural Engineering Practice Act of 1989
[225 ILCS
340 ], the Professional Geologist Licensing Act
[225 ILCS
745 ] (for site and groundwater conditions), or any
required combination of these Acts.
5) The Agency must not issue a construction
permit unless the community water supply has filed a notification of ownership
under 35 Ill. Adm. Code
603.101.
6) The existence of a violation of the Act,
Board rule, or Agency rule will not prevent the issuance of a construction
permit if:
A) the applicant has been granted a
variance or an adjusted standard from the rule by the Board;
B) the permit application is for the
construction or installation of equipment to alleviate or correct a
violation;
C) the permit
application is for a water main extension to serve existing residences or
commercial facilities when the permit applicant can show that those residences
or commercial facilities are served by a source of water of a quality or
quantity that violates the primary drinking water standards of 35 Ill. Adm.
Code 611; or
D) the Agency
determines the permit application is for the construction or installation of
equipment necessary to produce water that is assuredly safe, as required by 35
Ill. Adm. Code 601.101.
b) Algicide or Aquatic Pesticide Permit
The Agency must not issue an algicide or pesticide permit required by this Part unless the applicant submits adequate proof that the application of the algicide or aquatic pesticide will not cause a violation of the Act or Board or Agency rules.
Disclaimer: These regulations may not be the most recent version. Illinois may have more current or accurate information. We make no warranties or guarantees about the accuracy, completeness, or adequacy of the information contained on this site or the information linked to on the state site. Please check official sources.