Illinois Administrative Code
Title 35 - ENVIRONMENTAL PROTECTION
Part 391 - DESIGN CRITERIA FOR SLUDGE APPLICATION ON LAND
Subpart E - SAMPLE COLLECTION AND ANALYSIS
Appendix G - Sludge User Information Sheet

Universal Citation: 35 IL Admin Code ยง G
Current through Register Vol. 48, No. 38, September 20, 2024

1.

Date:

__________________________________________________________

2.

Name of User:

_____________________________________________________

3.

Address of User:

_________________________________________________

4.

Phone Number of User:

________________________________________________

5.

Location Where Sludge is to be Used:

______________________________________________

6.

Size of Area Where Sludge is to be Used:

______________________________________________

7.

Proximity of Site to closest:

(a) Stream or other body of water

________________

(b) Dwelling

__________________

(c) Well

_________________

(d) Other Water Supply, (describe)

______________________________________________

8.

Amount of Sludge Obtained:

(Specify units)

_______________________________________________

9.

Describe Use(s) of Sludge (e.g., Farmland or Agricultural, Garden, Yard, Reclamation of Nutrient Deficient Land, Other):

______________________________________________________________

______________________________________________________________

10.

Manner in Which Sludge is to be Applied (e.g., Spread by Truck or dry applicator, by Hand, Worked into the Soil by Plowing, Rototilling, Surface Application, Splash Plate, Knife injection, other):

______________________________________________________________

______________________________________________________________

11.

Will Sludge be Stockpiled Before Application:

Yes

No

(Circle One)

12.

Estimated Length of Time Sludge is to be Stockpiled:

______________________

13.

Type and expected yield of crops to be grown on sludge conditioned land:

______________________________________________________________

______________________________________________________________

______________________________________________________________

14.

I desire to have the sludge applied at a rate that will satisfy my crop's NITROGEN; PHOSPHORUS (Circle One) needs.

15.

The soil pH of the land that I am applying sludge is:

_____________________________

16.

The average depth to the groundwater table on the site where I am using the sludge is

_____________

ft.

How determined?

________________________________________________

17.

Limitations from Site Characteristics:

______________________________________________

______________________________________________________________

18.

Has sludge been applied to land within last 5 years?

Yes

No

(Circle One)

Name of Generator

__________________________

Amount Applied

__________________________

Years Applied

___________________________

SPECIFIC REQUIREMENTS FOR THE USE OF SLUDGE

The sludge that you are obtaining contains the following:

Plant Available Nitrogen (N) ____ % and/or ____ lbs. per dry ton

Phosphorus (P2O5) _____ % and/or ____ lbs. per dry ton

Soluble Potash (K2O) _______________ % and/or ____ lbs per dry ton_____

Cadmium (Cd) ______ lbs. per dry ton_______________________________

Copper (Cu) ____ lbs. per dry ton__________________________________

Lead (Pb) _____ lbs. per dry ton

Manganese (Mn) _____ lbs. per dry ton______________________________

Nickel (Ni) _____ lbs. per dry ton___________________________________

Zinc (Zn) ____ lbs. per dry ton_____________________________________

To maximize the benefits of conditioning soils with sludge and minimizing possible adverse effects on the environment, it is required that the following provisions be adhered to:

1. Cropping and Access Restrictions:

a. It is not recommended that leafy or root vegetables such as lettuce, Swiss chard, potatoes, horseradish, carrots, etc., be grown on sludge conditioned soil.

b. Pasture or hay ground that has received sludge shall not be harvested or used for livestock grazing for one month or until precipitation of sufficient duration and intensity has occurred and washed all sludge from that area of the plant which can be injested by an animal, whichever is greater.

2. Climate Conditions:

a. Sludge application shall not be permitted on land during precipitation.

b. Sludge application shall not be permitted on land which is saturated or with ponded water.

c. Sludge application should not be permitted upon sites when precipitation is imminent or which have received greater than 1/4 inch rainfall within the 24 hour period preceding the application time.

d. Sludge application shall not be permitted on ice or snow covered ground. Frozen ground which is not ice or snow covered and has a slope of 5% or less may be used for winter spreading providing a 200 feet grassy area of forage crop exists between the sludge applied land and any surface water or water well.

3. Buffer Area Requirements

a. Sludge shall not be applied on land which lies within 150 feet from wells or other water supplies and 200 feet from surface waters or within one-fourth of a mile of any potable water supply well located in consolidated bedrock or sinkhole areas unless 50 feet of non-sandy or non-gravelly unconsolidated material exists.

b. Sludge application by incorporation or injection shall not be done closer than 20 feet from any occupied dwelling or 10 feet from the closest edge of traveled portions of a public road or outside roadway fence lines.

c. Top application of sludge with no immediate incorporation shall not be done closer than 200 feet from any occupied dwelling or 20 feet from the closest edge of traveled portions of a primary and secondary public roads or 10 feet from the closest edge of lesser utilized public roads or outside roadway fence lines.

d. Sludge application by ridge and furrow shall not be done closer than 200 feet from any occupied dwelling or the closest edge of traveled portions of a public road or outside roadway fence lines.

e. Sludge shall not be applied in waterways. Application to flood plains having a frequency of return more often than a ten-year frequency shall not be allowed.

4. Soil and Geologic Conditions:

a. Sludge applied land must have a soil pH of 6.5 or greater and cation exchange capacity of 5 or greater. Water treatment plant lime sludge may be used to raise the soil pH.

b. For sludge applied soils having the following infiltration rates/hour as determined by standard percolation tests, the listed minimum soil depth to the mean annual water table shall be adhered to:

Greater than 2 inches/hour - 10 feet

Less than or equal to 2 inches/hour - 5 feet

c. Sludge shall not be top applied (no incorporation) to farm land having greater than 5% slope. If the slope does exceed 5% top application can be used providing the annual soil loss, as calculated by the Universal Soil Loss Equation shall not exceed 5 tons/acre.

d. Sludge may be incorporated on lands having slopes up to eight percent, irrespective of soil loss. If the slope exceeds eight percent, incorporation methods may be used providing the annual soil loss does not exceed five tons per acre when applying the Universal Soil Loss Equation.

5. Interim Storage and Application Restrictions:

a. Off-site interim storage of liquid sludge prior to land application is not allowed.

b. Off-site interim storage of dried sludge in excess of 2 months is not allowed.

c. Annual sludge application shall not exceed the nitrogen agronomic rates for the crop grown nor exceed the rate for the most restrictive heavy metal for the site lifetime, whichever is more restrictive. Therefore, the maximum annual amount of sludge you can apply for your specific needs may not exceed _____dry tons/acre; gallons/acre (Circle One).

________________________________________

I hereby agree to adhere to the above conditions.

All blanks other than the above sign-off shall be filled in by the sludge generator.

Disclaimer: These regulations may not be the most recent version. Illinois may have more current or accurate information. We make no warranties or guarantees about the accuracy, completeness, or adequacy of the information contained on this site or the information linked to on the state site. Please check official sources.
This site is protected by reCAPTCHA and the Google Privacy Policy and Terms of Service apply.