Illinois Administrative Code
Title 35 - ENVIRONMENTAL PROTECTION
Part 375 - COMBINED SEWER OVERFLOW EXCEPTION CRITERIA AND FIRST FLUSH DETERMINATION
Subpart D - FIRST FLUSH DETERMINATION
Section 375.401 - Variables in First Flush Determination

Current through Register Vol. 48, No. 38, September 20, 2024

The intensity and duration of first flush are a function of certain variables including:

a) Physical and hydraulic features of the sewer system and tributary watershed.

b) Amount of sediment accumulated in the sewer system and on impervious surfaces of the watershed.

c) Intensity and duration of the storm event causing the flushing.

Disclaimer: These regulations may not be the most recent version. Illinois may have more current or accurate information. We make no warranties or guarantees about the accuracy, completeness, or adequacy of the information contained on this site or the information linked to on the state site. Please check official sources.
This site is protected by reCAPTCHA and the Google Privacy Policy and Terms of Service apply.