Illinois Administrative Code
Title 35 - ENVIRONMENTAL PROTECTION
Part 370 - ILLINOIS RECOMMENDED STANDARDS FOR SEWAGE WORKS
Subpart E - SEWAGE TREATMENT WORKS
Section 370.540 - Plant Outfalls
Current through Register Vol. 48, No. 38, September 20, 2024
a) Discharge Impact Control
The outfall sewer shall be designed to discharge to the receiving stream in a manner acceptable to the Agency. Consideration should be given in each case to the following:
b) Design and Construction
The outfall sewer shall be so constructed and protected against the effects of flood water, waves, ice, or other hazards as to reasonably insure its structural stability and freedom from stoppage. A manhole should be provided at the shore end of all gravity sewers extending into the receiving waters. Hazards to navigation shall be considered in designing outfall sewers.
c) Sampling Provisions
All outfalls shall be designed so that a sample of the effluent can be readily obtained at a point after the final treatment process and before discharge to or mixing with the receiving waters.