Illinois Administrative Code
Title 35 - ENVIRONMENTAL PROTECTION
Part 370 - ILLINOIS RECOMMENDED STANDARDS FOR SEWAGE WORKS
Subpart B - ENGINEERING REPORTS, PLANS AND SPECIFICATIONS
Section 370.211 - Design Flows

Current through Register Vol. 48, No. 38, September 20, 2024

The following flows shall be identified in the basis of design for sewers, lift stations, sewage treatment plants, treatment units and other wastewater handling facilities.

a) Design Average Flow

The design average flow is the average of the daily volumes to be received for a continuous 12-month period of the design year, expressed as a volume per unit of time.

b) Design Maximum Flow

The design maximum flow is the largest volume of flow to be received during a continuous 24-hour period, expressed as a volume per unit of time.

c) Design Peak Hourly Flow

The design peak hourly flow is the largest volume of flow to be received during a one hour period, expressed as a volume per unit of time.

d) Design Peak Flow

The design peak flow is the instantaneous maximum flowrate to be received.

Disclaimer: These regulations may not be the most recent version. Illinois may have more current or accurate information. We make no warranties or guarantees about the accuracy, completeness, or adequacy of the information contained on this site or the information linked to on the state site. Please check official sources.
This site is protected by reCAPTCHA and the Google Privacy Policy and Terms of Service apply.