Illinois Administrative Code
Title 35 - ENVIRONMENTAL PROTECTION
Part 368 - PROCEDURES FOR DETERMINING PRIORITIES FOR ASSISTANCE AWARDS UNDER THE ILLINOIS CLEAR LAKES PROGRAM
Subpart B - PROCEDURES FOR CALCULATING PRIORITY POINTS FOR INLAND LAKE STUDY AND IMPLEMENTATION PROJECT AWARDS
Section 368.250 - A4 Factor (Special Considerations)

Current through Register Vol. 48, No. 38, September 20, 2024

A4 is a factor that will only be used for two or more project applications having equal total priority points based on the sum of Factors A1, A2, and A3. In such cases priority points will be allocated to each affirmative answer to the following questions (Yes-1, No-0). For the A4 factor, priority points are allocated as follows (0-5 points possible):

a) Does the project utilize a comprehensive watershed and management approach?

b) Has the tributary watershed area been previously protected to prevent point and nonpoint source pollution to the lake?

c) Does the project include coordination of activities with other local, State, and federal agencies?

d) Is there a commitment by the applicant to cost-share more than the minimum required by at least an additional 10%?

e) Does the applicant have a history of undertaking previous lake or watershed management efforts to solve lake problems?

Disclaimer: These regulations may not be the most recent version. Illinois may have more current or accurate information. We make no warranties or guarantees about the accuracy, completeness, or adequacy of the information contained on this site or the information linked to on the state site. Please check official sources.