Illinois Administrative Code
Title 35 - ENVIRONMENTAL PROTECTION
Part 362 - PROCEDURES FOR ADMINISTRATION OF THE CONSTRUCTION MANAGEMENT ASSISTANCE PROGRAM FOR GRANTS UNDER THE CLEAN WATER ACT
Subpart A - GENERAL
Section 362.104 - Grant Assistance Availability
Universal Citation: 35 IL Admin Code ยง 362.104
Current through Register Vol. 48, No. 38, September 20, 2024
a) For projects on the Project Priority List, the following grant assistance is available, subject to the availability of funding under federal appropriation:
1) Step
1 (facilities planning). No grant assistance is available for Step 1, except
for amendments to existing Step 1 grants. If a Step 3 or Step 2 + 3 grant is
later offered, an allowance for facility planning may be provided by the USEPA
at the prevailing federal share.
2)
Step 2 (design engineering and specifications). No grant assistance is
available for Step 2, except for amendments to existing Step 2 grants. If a
Step 3 grant is later offered, an allowance for design engineering and
specifications may be provided by the USEPA at the prevailing federal share. If
a Step 2 + 3 grant is offered, Step 2 will consist of an allowance for design
engineering and specifications at the prevailing federal share.
3) Step 3 (building). Step 3 grants at the
prevailing federal share are available in accordance with the approved Water
Pollution Control Program Plan to grant applicants with a Grant Priority Index
of 94 or higher as established under 35 Ill. Adm. Code 364. Funding for Step 3
for projects utilizing innovative or alternative wastewater systems with a
Grant Priority Index of less than 94 is contingent upon the availability of
funds for alternative and innovative projects. Where no Step 1 and Step 2
grants, or Step 1 grant and advance of allowance for Step 2, have been
previously awarded, the Step 3 grant will include the federal share of the
allowance for both facilities planning and design engineering and
specifications. Where a Step 1 grant has been previously awarded, and no Step 2
grant or advance of allowance for Step 2 has been previously awarded, the Step
3 grant will include the federal share of the allowance for design engineering
and specifications only. Step 3 grants will include the federal share of the
total estimated eligible Step 3 costs.
4) Step 2 + 3 (design engineering and
specifications and building). Step 2 + 3 grants at the prevailing federal share
are available in accordance with the approved Water Pollution Control Program
Plan to grant applicants with a Grant Priority Index of 94 or higher as
established under 35 Ill. Adm. Code 364, and which have a population of 25,000
or less, a total estimated Step 3 building cost of $8 million or less, and a
project that is not phased or segmented. Step 2 +3 funding for projects using
alternative or innovative wastewater systems which qualify for a Step 2 + 3
grant, and with a Grant Priority Index of less than 94, is contingent upon the
availability of funds for alternative and innovative projects. Where no Step 1
grant has been previously awarded, the Step 2 + 3 grant will include the
federal share of the allowance for facilities planning and design. Where a Step
1 grant has been previously awarded, the Step 2 + 3 grant will include the
federal share of the allowance for design engineering and specifications only.
The Step 2 + 3 grant will include the federal share of the total estimated
eligible Step 3 costs.
5) Advance
of allowance
A) Advance of the federal share
of an allowance is available to a community with a population of 25,000 or less
and which is eligible for the advance under 40 CFR 35, Subpart I. The advance
shall not exceed the federal share of the allowance for such costs
received.
B) Where an advance of
allowance has been awarded to a grantee that subsequently refuses to accept a
Step 2 + 3 or Step 3 grant, the grantee shall repay the advance. Where a Step 2
+ 3 or Step 3 grant is awarded to a grant recipient that has received an
advance, the federal share of the allowance will be reduced by the amount of
the advance.
b) The federal share for total eligible Step 3 costs, the allowance for both Step 1 and Step 2, the allowance for Step 2 only, and the advance of allowance, is as follows:
1) 75 percent for grant assistance awarded
before October 1, 1984.
2) 55
percent for grant assistance awarded after September 30, 1984, except that
grant assistance shall be available at 75 percent for sequential phases or
segments of an eligible project under 40 CFR 35, Subpart I where such project
is described in the facilities plan, and the Step 3 grant for the initial phase
or segment was awarded prior to October 1, 1984.
3) 85 percent for grant assistance awarded
before October 1, 1984 for projects utilizing innovative or alternative
wastewater conveyance and treatment systems. After September 30, 1984, grant
assistance for such projects is available at 75 percent, or 85 percent if the
project is a sequential phase or segment of an eligible project under 40 CFR
35, Subpart I.
Disclaimer: These regulations may not be the most recent version. Illinois may have more current or accurate information. We make no warranties or guarantees about the accuracy, completeness, or adequacy of the information contained on this site or the information linked to on the state site. Please check official sources.