Illinois Administrative Code
Title 35 - ENVIRONMENTAL PROTECTION
Part 276 - PROCEDURES TO BE FOLLOWED IN THE PERFORMANCE OF INSPECTIONS OF MOTOR VEHICLE EMISSIONS
Subpart E - TEST EQUIPMENT SPECIFICATIONS
Section 276.504 - Evaporative System Integrity Test Functional Requirements and Performance Criteria
Universal Citation: 35 IL Admin Code ยง 276.504
Current through Register Vol. 48, No. 38, September 20, 2024
a) Requirements
Both fuel cap leak flow testers and fuel cap pressure decay testers used for evaporative system integrity testing shall be:
1) Easily connected to fuel caps, including
those tethered to the vehicle;
2)
Compatible with at least 95 percent of all vehicles required to receive a fuel
cap test;
3) Adaptable as required
to test future model year vehicles as they enter the eligible fleet;
4) Capable of performing the following
additional functions:
A) Provide reliable,
continuous service;
B) Provide for
the automatic selection of the proper fuel cap test equipment (if applicable)
for each vehicle tested;
C) Provide
for an automatic pass/fail determination for each vehicle tested;
5) Unaffected by atmospheric
variation (i.e., barometric pressure, humidity, temperature, etc.). Test
accuracy shall be within 2 percent of stated values from 0°F to
120°F;
6) Pressurized using
air, Nitrogen (N2), or an equivalent non-toxic,
non-greenhouse, inert gas;
7)
Capable of controlling the supply pressure and preventing over
pressurization;
8) Tamper
resistant; and
9) Designed to avoid
damage to the vehicle during installation, testing and removal.
b) Fuel cap pressure decay tester
The fuel cap pressure decay tester used for evaporative system integrity testing shall be equipped with a pressure gauge with a minimum range of 0 to 50 inches of water and an accuracy of 0.3 inches of water or 2 percent of point, whichever is greater.
c) Fuel cap leak flow tester
The fuel cap leak flow tester used for evaporative system integrity testing shall be:
1)
Equipped with a serviceable air filter upstream of the flow comparison
circuitry;
2) Equipped with an
automatic shutoff and a low-battery indicator if battery powered;
3) Supplied with a NIST traceable reference
passing fuel cap of nominal 52 to 56 cc/min for daily test
verification;
4) Supplied with a
NIST traceable reference failing fuel cap of nominal 64 to 68 cc/min for daily
test verification;
5) Accurate to 3
cc/min at the 60 min flow standard; and
6) Able to be modified, either by the
manufacturer or an authorized service center, to test at a revised leakage
(flow) rate from that originally shipped.
Disclaimer: These regulations may not be the most recent version. Illinois may have more current or accurate information. We make no warranties or guarantees about the accuracy, completeness, or adequacy of the information contained on this site or the information linked to on the state site. Please check official sources.
This site is protected by reCAPTCHA and the Google
Privacy Policy and
Terms of Service apply.