Section 270.408 - Malfunction or Breakdown

Current through Register Vol. 48, No. 38, September 20, 2024

A request to continue to operate an emission unit in excess of the standards or limitations of Subchapter c of Chapter I of the Board's Air Pollution regulations (35 Ill. Adm. Code 212 et seq.) during a malfunction or breakdown of the emission unit or related air pollution control equipment, if desired, must be contained in the CAAPP application and shall include, at a minimum, a detailed explanation of why such continued operation will be necessary; the nature of any anticipated malfunction or breakdown; emission points and quantities of emissions which will occur during such continued operation; the anticipated length of time during which such operation will continue; all measures, such as use of off-shift labor or equipment, which will be taken to minimize the quantity of air contaminant emissions and length of time during which such operation will continue; and the calculations used to determine the above information. The Agency may grant permission to operate during a malfunction or breakdown in accordance with 35 Ill. Adm. Code 201.262.

Disclaimer: These regulations may not be the most recent version. Illinois may have more current or accurate information. We make no warranties or guarantees about the accuracy, completeness, or adequacy of the information contained on this site or the information linked to on the state site. Please check official sources.
This site is protected by reCAPTCHA and the Google Privacy Policy and Terms of Service apply.