a) Any
owner or operator of a VOM emission unit which is subject to the requirements
of Subpart PP, QQ, RR or TT and complying by the use of emission capture and
control equipment shall comply with the following:
1) By a date consistent with Section
219.106 of this
Part, or upon initial start-up of a new emission unit, the owner or operator of
the subject VOM emission unit shall demonstrate to the Agency that the subject
emission unit will be in compliance on and after a date consistent with Section
219.106 of this
Part, or on and after the initial start-up date by submitting to the Agency all
calculations and other supporting data, including descriptions and results of
any tests the owner or operator may have performed.
2) On and after a date consistent with
Section
219.106 of this
Part, or on and after the initial start-up date, the owner or operator of a
subject VOM source shall collect and record all of the following information
each day and maintain the information at the source for a period of three
years:
A) Control device monitoring
data.
B) A log of operating time
for the capture system, control device, monitoring equipment and the associated
emission source.
C) A maintenance
log for the capture system, control device and monitoring equipment detailing
all routine and non-routine maintenance performed including dates and duration
of any outages.
3) On
and after a date consistent with Section
219.106 of this
Part, the owner or operator of a subject VOM source shall notify the Agency in
the following instances:
A) Any record
showing a violation of the requirements of Subpart PP, QQ, RR or TT shall be
reported by sending a copy of such record to the Agency within 30 days
following the occurrence of the violation.
B) At least 30 calendar days before changing
the method of compliance with Subpart PP or TT from the use of capture systems
and control devices to the use of complying coatings, the owner or operator
shall comply with all requirements of subsection (b)(1) of this Section. Upon
changing the method of compliance with Subpart PP or TT from the use of capture
systems and control devices to the use of complying coatings, the owner or
operator shall comply with all requirements of subsection (b) of this
Section.
4) Testing
A) When in the opinion of the Agency it is
necessary to conduct testing to demonstrate compliance with this Subpart, the
owner or operator of a VOM emission source subject to the requirements of this
Subpart shall, at his own expense, conduct such tests in accordance with the
applicable test methods and procedures specified in Section
219.105
of this Part.
B) Nothing in this
Section shall limit the authority of the USEPA pursuant to the Clean Air Act,
as amended, to require testing.
b) Any owner or operator of a coating line
which is subject to the requirements of Subpart PP or TT and complying by means
of the daily-weighted average VOM content limitation shall comply with the
following:
1) By a date consistent with
Section
219.106 of this
Part, or upon initial start-up of a coating line subject to Subpart PP or TT,
the owner or operator of the subject coating line shall certify to the Agency
that the coating line will be in compliance on and after a date consistent with
Section
219.106 of this
Part, or on and after the initial start-up date. Such certification shall
include:
A) The name and identification
number of each coating line which will comply by means of the daily-weighted
average VOM content limitation.
B)
The name and identification number of each coating as applied on each coating
line.
C) The weight of VOM per
volume and the volume of each coating (minus water and any compounds which are
specifically exempted from the definition of VOM) as applied each day on each
coating line.
D) The instrument or
method by which the owner or operator will accurately measure or calculate the
volume of each coating as applied each day on each coating line.
E) The method by which the owner or operator
will create and maintain records each day as required in subsection
(b)(2).
F) An example of the format
in which the records required in subsection (b)(2) of this Section will be
kept.
2) On and after a
date consistent with Section
219.106 of this
Part, or on and after the initial start-up date, the owner or operator of a
subject coating line shall collect and record all of the following information
each day for each coating line and maintain the information at the source for a
period of three years:
A) The name and
identification number of each coating as applied on each coating
line.
B) The weight of VOM per
volume and the volume of each coating (minus water and any compounds which are
specifically exempted from the definition of VOM) as applied each day on each
coating line.
C) The daily-weighted
average VOM content of all coatings as applied on each coating line as defined
in Section
219.104 of this
Part.
3) On and after a
date consistent with Section
219.106 of this
Part, the owner or operator of a subject coating line shall notify the Agency
in the following instances:
A) Any record
showing violation of the requirements of Subpart PP or TT shall be reported by
sending a copy of such record to the Agency within 30 days following the
occurrence of the violation.
B) At
least 30 calendar days before changing the method of compliance with Subpart PP
or TT from the use of complying coatings to the use capture systems and control
devices, the owner or operator shall comply with all requirements of subsection
(a)(1) of this Section. Upon changing the method of compliance with Subpart PP
or TT from the use of complying coatings to the use capture systems and control
devices, the owner or operator shall comply with all requirements of subsection
(a) of this Section.
c) Any owner or operator of a VOM emission
source which is subject to the requirements of Subpart PP, QQ, RR or TT and
complying by means of an alternative control plan which has been approved by
the Agency and approved by the USEPA as a SIP revision shall comply with the
recordkeeping and reporting requirements specified in the alternative control
plan.