Illinois Administrative Code
Title 35 - ENVIRONMENTAL PROTECTION
Part 174 - DELEGATION OF CONSTRUCTION AND OPERATING PERMIT AUTHORITY FOR SANITARY AND COMBINED SEWERS AND WATER MAIN EXTENSIONS
Subpart C - STANDARD CONDITIONS FOR WATER MAIN EXTENSION PERMIT DELEGATION
Section 174.302 - Technical Staff
Current through Register Vol. 48, No. 38, September 20, 2024
a) The applicant shall employ a qualified technical staff which assures that permit application reviews are properly conducted and that permits are properly issued.
b) Except as provided otherwise in subsection (d):
c) Qualifications
d) Use of Consultants
e) If the unit of local government prepares its own plan documents for constructing water main extensions, there shall be at least one person on the technical staff who is in responsible charge of the preparation of these documents. This person shall be a registered Professional Engineer in Illinois and shall have at least two years of experience in the preparation of water main plan document for Illinois public water supplies. This person shall not be the same person designated in subsection (c). No person shall issue a permit for water main construction designed by or under their own supervision.
f) There shall be at least one certified public water supply operator of the proper class on the technical staff to comply with requirements of 35 Ill. Adm. Code 603.102.