Illinois Administrative Code
Title 35 - ENVIRONMENTAL PROTECTION
Part 1422 - DESIGN AND OPERATION OF FACILITIES
Subpart C - TREATMENT FACILITIES
Appendix A - Initial Efficacy Test Procedures
Table C - Challenge Loads

Universal Citation: 35 IL Admin Code ยง C
Current through Register Vol. 48, No. 38, September 20, 2024

This table identifies the three types of challenge loads of PIMW that must be used as part of the Initial Efficacy Test and Periodic Verification Test.

COMPOSITION OF CHALLENGE LOADS

% (w/w)

A

B

C

Moisture

[LESS THAN OR EQUAL TO] 5

[GREATER THAN OR EQUAL TO] 50

- - -

Organic

- - -

- - -

[GREATER THAN OR EQUAL TO] 70

Disclaimer: These regulations may not be the most recent version. Illinois may have more current or accurate information. We make no warranties or guarantees about the accuracy, completeness, or adequacy of the information contained on this site or the information linked to on the state site. Please check official sources.