Illinois Administrative Code
Title 35 - ENVIRONMENTAL PROTECTION
Part 1100 - CLEAN CONSTRUCTION OR DEMOLITION DEBRIS FILL OPERATIONS AND UNCONTAMINATED SOIL FILL OPERATIONS
Subpart C - PERMIT APPLICATION INFORMATION FOR CCDD FILL OPERATIONS
Section 1100.308 - Surface Water Control

Current through Register Vol. 48, No. 38, September 20, 2024

The permit application must contain a plan for controlling surface water that demonstrates compliance with Section 1100.202 of this Part, and that includes at least the following:

a) A copy of any approved National Pollutant Discharge Elimination System (NPDES) permit issued pursuant to 35 Ill. Adm. Code 309 to discharge runoff from all filled areas of the facility, or a copy of any such NPDES permit application if an NPDES permit is pending; and

b) A map showing the location of all surface water control structures at the facility.

Disclaimer: These regulations may not be the most recent version. Illinois may have more current or accurate information. We make no warranties or guarantees about the accuracy, completeness, or adequacy of the information contained on this site or the information linked to on the state site. Please check official sources.
This site is protected by reCAPTCHA and the Google Privacy Policy and Terms of Service apply.