Illinois Administrative Code
Title 35 - ENVIRONMENTAL PROTECTION
Part 1100 - CLEAN CONSTRUCTION OR DEMOLITION DEBRIS FILL OPERATIONS AND UNCONTAMINATED SOIL FILL OPERATIONS
Subpart B - OPERATING STANDARDS FOR CCDD FILL OPERATIONS
Section 1100.202 - Surface Water Drainage

Current through Register Vol. 48, No. 38, September 20, 2024

a) Runoff from Filled Areas

1) All discharges of runoff from filled areas to waters of the State must be permitted by the Agency to the extent required under 35 Ill. Adm. Code 309.

2) All surface water control structures must be operated until the final cover is placed and the vegetative or other cover meeting the requirements of Section 1100.208 of this Part provides erosional stability.

b) Diversion of Runoff from Unfilled Areas

1) Runoff from unfilled areas must be diverted around filled areas to the greatest extent practical.

2) Diversion facilities must be constructed to prevent runoff from the 10-year, 24-hour precipitation event from entering filled areas.

3) Runoff from unfilled areas which becomes commingled with runoff from filled areas must be handled as runoff from filled areas in accordance with subsection (a) of this Section.

4) All diversion structures must be designed to have flow velocities that will not cause erosion and scouring of the natural or constructed lining (i.e., the bottom and sides) of the diversion channel and downstream channels.

5) All diversion structures must be operated until the final cover is placed and the vegetative or other cover meeting the requirements of Section 1100.208 of this Part provides erosional stability.

Disclaimer: These regulations may not be the most recent version. Illinois may have more current or accurate information. We make no warranties or guarantees about the accuracy, completeness, or adequacy of the information contained on this site or the information linked to on the state site. Please check official sources.
This site is protected by reCAPTCHA and the Google Privacy Policy and Terms of Service apply.