Illinois Administrative Code
Title 35 - ENVIRONMENTAL PROTECTION
Part 1100 - CLEAN CONSTRUCTION OR DEMOLITION DEBRIS FILL OPERATIONS AND UNCONTAMINATED SOIL FILL OPERATIONS
Subpart B - OPERATING STANDARDS FOR CCDD FILL OPERATIONS
Section 1100.201 - Prohibitions

Current through Register Vol. 48, No. 38, September 20, 2024

a) No person shall conduct any CCDD fill operation in violation of the Act or any regulations or standards adopted by the Board. [415 ILCS 5/22.51(a)] .

b) CCDD fill operations must not accept waste for use as fill.

c) CCDD fill operations must not be located inside a setback zone of a potable water supply well. (See Section 3.160(b)(i) of the Act.)

d) No person shall use soil other than uncontaminated soil as fill material at a CCDD fill operation. [415 ILCS 5/22.51(g)(1)]

e) No person shall use construction or demolition debris other than CCDD as fill material at a CCDD fill operation. [415 ILCS 5/22.51(g)(2)]

f) Except as provided in Section 1100.212 of this Part, no person shall use painted clean construction or demolition debris (painted CCDD) as fill material at a CCDD fill operation.

g) CCDD fill operations must not accept uncontaminated soil with pH outside the range of 6.25 to 9.0.

Disclaimer: These regulations may not be the most recent version. Illinois may have more current or accurate information. We make no warranties or guarantees about the accuracy, completeness, or adequacy of the information contained on this site or the information linked to on the state site. Please check official sources.
This site is protected by reCAPTCHA and the Google Privacy Policy and Terms of Service apply.