Illinois Administrative Code
Title 23 - EDUCATION AND CULTURAL RESOURCES
Part 3035 - ILLINOIS STATE LIBRARY GRANT PROGRAMS
Subpart E - PUBLIC LIBRARY CONSTRUCTION ACT GRANTS
Section 3035.580 - Standardized Definitions and Guidelines
Current through Register Vol. 48, No. 38, September 20, 2024
The following standardized definitions and guidelines enumerate the appropriate utilization of the Build Illinois Bond proceeds appropriated to the State Librarian to finance bondable capital improvements as listed in Section 3035.575(b) of this Part.
a) Planning. Bondable planning costs include those expenditures that are related to the public library facilities plan and architectural/engineering design required for planning the construction or installation of bondable capital improvement projects. Included are costs for schematic design development, which refers to preliminary studies developed from program statements that reflect the general functional characteristics and architectural requirements of a bondable capital improvement project; costs for definitive design development, which means the refinement of schematic design into final detailed design requirements; and costs incurred for the completion of construction documents and detailed working drawings required for bidding and construction, including any allowable reimbursables provided within an executed contract for professional and technical services.
b) Land. Land includes expenditures for the acquisition of real property (including easements of record with an extended term, but excluding any leasehold interests obtained through rental of real property), whether obtained by purchase or by condemnation under the applicable eminent domain laws of the State of Illinois, and for all expenses directly and necessarily related to such purchase or condemnation. All necessary and reasonable expenses incurred in the acquisition of real property qualify for bond financing. These expenditures may include but are not limited to the following:
c) Buildings, Additions and/or Structures. Buildings, additions and/or structures shall mean and include those facilities with a roof and/or walls that have a foundation. This category also includes site developments necessarily required or related to the preparation of a site for construction purposes and required built-in, special-purpose, or other fixed equipment that is permanently affixed or connected to real property in such a manner that removal would cause consequent damage to the real property to which it is affixed. All expenditures that may be classified within the category defined shall be bondable.
d) Utilities. In general, the category utilities shall mean and include expenditures for the acquisition, construction, replacement, modernization and/or extension of systems for distributing or disbursing utility services. Bondable utility costs may include, but are not limited to, the following items:
e) Durable Movable Equipment
f) Site Improvements. Site Improvements means and includes expenditures for all improvements to real property that are not otherwise included within the category of buildings, additions and/or structures (subsection (c) of this Section). Bondable site improvement expenditures shall include all site improvement costs incidental to demolition, rough and final grading of a site, and the construction or replacement of sidewalks, road and driveway pavement surfaces, bridges, ramps, curbs, overpasses, underpasses, pedestrian bridges and tunnels, surface parking areas, building terraces, retaining walls, exterior lighting, and seeding or sodding for erosion control only if related to a bondable capital improvement project.
g) Remodeling and Rehabilitation
h) Maintenance and Upkeep
i) Direct Costs Associated with the Issuance of Build Illinois Bonds. Costs of this nature shall include expenses associated with advertising, printing, bond rating, security, delivery, legal and financial services, and all other expenses incident to the issuance of Build Illinois Bonds.