Idaho Administrative Code
Title IDAPA 37 - Water Resources, Department of
Rule 37.03.06 - SAFETY OF DAMS RULES
Section 37.03.06.035 - DESIGN REPORTS, DRAWINGS, AND SPECIFICATIONS
Current through September 2, 2024
The following provisions shall apply when submitting plans, drawings, reports, and specifications for dams to the Director for design review and approval, prior to commencing construction.
01. Submission of Duplicate Plans, Drawings and Specifications. Any owner desiring to construct, enlarge, alter, or repair any dam, shall submit duplicate plans, drawings and specifications prepared by an engineer for the proposed work to the Director with required fees for approval prior to commencing construction.
02. Applying for and Obtaining Written Approval. Construction of a new dam, or the enlargement, alteration, or repair of such shall not commence until the owner has applied for and obtained written approval of the plans, drawings, and specifications from the Director.
03. Preparation and Submission of Plans. Plans and drawings shall be of a sufficient scale with an adequate number of views showing proper dimensions, so that the plans and drawings may be readily interpreted and so that the structure and appurtenances can be built in conformance with the approved design. Plans and drawings shall be submitted in both printed and digital format, with the printed version consisting of paper size eleven by seventeen (11 x 17) inches. After reviewing the plans, the Director will notify the owner of any required changes.
04. Information Included with Plans. Plans for new dams or the enlargement, alteration, or repair of such shall include as much of the following information as determined necessary by the Director to adequately describe the enlargement, alteration, or repair and the effect on the existing structure or its appurtenances:
05. Specifications. The engineer shall prepare specifications that include instructions for construction of the approved design in accordance with accepted engineering and industry standards of care, including provisions for adequate observation, inspection, and control of the work by an engineer during the period of construction.
06. Changes to the Approved Design. The approved design shall not be materially changed without prior written consent of the Director. Design changes which may affect the stability, size, or integrity of the structure, while construction is underway, shall be submitted for the Director's review and approval. In emergency situations, the owner shall make the required alterations or repairs necessary to relieve the emergency, and subsequently notify the Director of all alterations or repairs implemented.
07. Inspections. The owner shall allow inspections by the Department to assure the dam and appurtenant structures are constructed in conformance with the approved plans and specifications, or as may be revised by the engineer and approved by the Director if there are unforeseen conditions discovered during site preparation or construction which potentially jeopardize the future integrity and safety of the project works. The Department may request of the owner that certain stages of construction not proceed without inspection and approval by the Director.
08. Inspection, Examination and Testing of Materials. All materials and workmanship shall be subject to review, inspection, examination, or testing by the Director.
09. Rejection of Defective Material. The Director may order the owner or engineer to reject defective material. The owner shall correct rejected workmanship and replace rejected material with approved material.
10. Suspension of Work. The Director may order the engineer to suspend any work that is or is likely to be subject to damage by inclement weather conditions.
11. Responsibility of Engineer. These provisions shall not relieve the engineer of their responsible charge to assure that construction is accomplished in accordance with their approved plans and specifications as mandated by Sections 54-1202(10) and (15), Idaho Code, or to unilaterally suspend work as deemed necessary.
12. Design Report. Owners proposing to construct, enlarge, alter, or repair a dam shall submit an engineering or design evaluation report to accompany the plans and specifications. The engineering report shall include as much of the following information as necessary to present the technical basis for the design and to describe the analyses used to evaluate performance of the structure and appurtenances.
13. Additional Information/Waiver. The Director may require the filing of such additional information which in their opinion is necessary for the benefit of public safety or waive any requirement in these rules if available data demonstrates that it is unnecessary.
14. Alternate Plans. The Director may accept plans and specifications for dams, or portions thereof prepared for other agencies which are determined to meet the requirements of Rule 35, including but not limited to the following:
Effective March 30, 2023