01.
Permit
Application. Every person required by Section
25-4003, Idaho Code, to obtain a
permit must submit a permit application to the department. The permit
application will be used to determine if the construction and operation of the
poultry CAFO will be in conformance with these rules. (3-15-22)
02.
Contents of Application.
Each application must include, in the format set forth by the director in
sufficient detail to allow the director to make necessary application review
decisions concerning design and environmental protection by providing the
following: (3-15-22)
a. Name, mailing address
and phone number of the facility owner. (3-15-22)
b. Name, mailing address and phone number of
the facility operator. (3-15-22)
c.
Name and mailing address of the facility. (3-15-22)
d. Legal description of the facility
location. (3-15-22)
e. The one-time
animal capacity, by head, of the facility. (3-15-22)
f. The type of animals to be confined at the
facility. (3-15-22)
g. The
facility's biosecurity and sanitary standards. (3-15-22)
03.
Construction Plans. Plans
and specifications for the facility's animal waste management system that
include the following information: (3-15-22)
a. Vicinity map(s) prepared on one (1) or
more seven and one-half minute (7.5') USGS topographic quadrangle maps or a
high quality reproduction(s) that includes the following: (3-15-22)
i. Layout of the facility, including
buildings and animal waste management system; (3-15-22)
ii. The one hundred (100) year FEMA flood
zones or other appropriate flood data for the facility site and land
application sites owned or leased by the applicant; and (3-15-22)
iii. Private and community domestic water
wells, irrigation wells, monitoring wells, and injection wells, irrigation
conveyance and drainage structures, wetlands, streams, springs, and reservoirs
that are within a one (1) mile radius of the facility.
(3-15-22)
b. A site plan
showing: (3-15-22)
i. Building locations;
(3-15-22)
ii. Waste facilities;
(3-15-22)
iii. All waste conveyance
systems; and (3-15-22)
iv. All
irrigation systems used for land application, including details of approved
water supply protection devices. (3-15-22)
c. Building plans showing: (3-15-22)
i. All wastewater collection systems in
housed units; (3-15-22)
ii. All
freshwater supply systems, including details of approved water supply
protection devices; (3-15-22)
iii.
Detailed drawings of wastewater collection and conveyance systems and
containment construction. (3-15-22)
d. If a CAFO Site Advisory Team suitability
determination was not conducted for the facility, the following additional
information must be provided: (3-15-22)
i.
Idaho DEQ delineated source water assessment areas within a one (1) mile radius
of the facility and land application area; (3-15-22)
ii. Idaho DEQ delineated nitrate priority
areas that intersect the facility or land application area; (3-15-22)
iii. Soil characteristics from NRCS; and
(3-15-22)
iv. Well logs associated
with wells listed in Subsection
110.04.a.iii.
(3-15-22)
e. All
construction plans will specify how the facility will meet the engineering
standards outlined in the Natural Resources Conservation Service Agricultural
Waste Management Field Handbook Appendix 10D (Appendix 10D) (March 2008
Edition) (USDA, NRCS), Natural Resources Conservation Service (NRCS) Idaho
Conservation Practice Standard Waste Storage Facility Code 313 December 2004,
or American Society of Agricultural and Biological Engineers Specification ASAE
EP393.3 Manure Storages February 2004. (3-15-22)
04.
Nutrient Management Plan.
NMPs must be prepared in conformance with the Nutrient Management Standard or
other equally protective standard for managing the amount, source, placement,
form and timing of the land application of nutrients or soil amendments.
(3-15-22)