Hawaii Administrative Rules
Title 6 - DEPARTMENT OF BUDGET AND FINANCE
Division - PUBLIC UTILITIES COMMISSION
Chapter 83 - HAWAII ONE CALL CENTER SUBSURFACE INSTALLATION DAMAGE PREVENTION PROGRAM
Subchapter 3 - DUTIES OF FACILITY OPERATORS
Section 6-83-46 - Response of facility operator upon receipt of notification; positive response
Current through August, 2024
(a) Upon receipt of a notification of proposed excavation from the center, a facility operator shall respond within five working days, as defined by chapter 269E, HRS, and these rules, of that notification, or before the start of the excavation work, whichever is later, or at a later time mutually agreeable to the facility operator and the excavator, by:
(b) The facility operator shall promptly notify the center by facsimile, e-mail, telephone, or the one call center computerized positive response system available on the worldwide web, of the action the facility operator has taken.
(c) All facility locate requests will result in a positive response from the facility operator to the one call center. A positive response may include one or more of the following: markings or documentation left at the job site, callback, fax, or automated response system, to notify the one call center.