Hawaii Administrative Rules
Title 12 - DEPARTMENT OF LABOR AND INDUSTRIAL RELATIONS
Subtitle 8 - HAWAII OCCUPATIONAL SAFETY AND HEALTH DIVISION
Part 10 - BOILER AND PRESSURE VESSEL
Chapter 224.1 - PRESSURE VESSELS
Section 12-224.1-4 - Inspections
Current through August, 2024
(a) Initial acceptance inspections shall be conducted and witnessed by the chief boiler inspector or deputy inspector designee. These inspections may include internal inspection where construction permits, post installation pressure test at the inspector's discretion, and operational testing of controls and safety devices by the installer, contractor, or owner. Tests shall be made in conformance with the procedures set forth in ASME BPVC, NBIC, and this part.
(b) Permit renewal inspections. Pressure vessels shall receive a permit renewal inspection every two years. Pressure vessels that are under the ownership, inspection, and supervision of an OUIO may be inspected on a different inspection frequency upon approval by the chief boiler inspector.
(c) Additional inspection requirements include the following: