Hawaii Administrative Rules
Title 12 - DEPARTMENT OF LABOR AND INDUSTRIAL RELATIONS
Subtitle 8 - HAWAII OCCUPATIONAL SAFETY AND HEALTH DIVISION
Part 10 - BOILER AND PRESSURE VESSEL
Chapter 223.1 - HEATING BOILERS - STEAM HEATING BOILERS, HOT-WATER HEATING BOILERS, HOT-WATER SUPPLY BOILERS, AND POTABLE WATER HEATERS
Section 12-223.1-2 - General requirements for heating boilers
Current through August, 2024
(a) The following shall apply to all heating boilers:
(b) Steam heating boilers not in use for a period of one year or more, for any reason, shall be inspected internally and externally before being placed into operation.
(c) Replacement of an existing heating boiler shall be in accordance with the requirements for new boiler installations.
(d) Replacement of a heating boiler at an existing location with a used or secondhand boiler shall comply with the requirements of new boiler installations. The following shall apply to used or secondhand heating boilers:
(e) Replacement or repairs to boiler fittings, appurtenances or appliances, controls and safety devices, shall comply with the requirements for new installations and applicable ASME BPVC and NBIC sections.
(f) Galvanized pipe shall not be used for steam supply and blowdown piping.
(g) State specials: applicable provisions include sections 12-220-2(b) and 12-220-16 (e) (6).